| 1. | Preliminary assessment indicated that strategic road link to the study area is not the main constraint 初步的评估结果显示,通往研究区的策略性道路并非主要的限制。 |
| 2. | Cwb is a strategic road linking the rumsey street flyover with the island eastern corridor via the island eastern corridor link 中环环仔绕道是一条非常重要的道路,可经由东区走廊连接路把林士街天桥和东区走廊连接起来。 |
| 3. | The central - wanchai bypass " cwb " is a strategic road linking the rumsey street flyover with the island eastern corridor via the island eastern corridor link 中环环仔绕道是一条非常重要的道路,可经由东区走廊连接路把林士街天桥和东区走廊连接起来。 |
| 4. | A comprehensive study will be conducted and is targeted for completion by mid - 2000 . together with the other phases of central and wan chai reclamation , it will accommodate strategic road links along the north shore of hong kong island between central and the eastern part 这期工程连同中环及湾仔填海计划其他各期工程,将会提供土地沿港岛北岸(中环与港岛东部之间)兴建重要连接路。 |
| 5. | The green island reclamation will produce about 186 hectares of land ( including some 10 hectares already formed under the belcher bay link project ) on the north of kennedy town for residential development and strategic road links as well as provision of open spaces including waterfront promenades and an urban fringe park 青洲填海工程将在坚尼地城北面填造约186公顷土地(包括约十公顷在卑路乍湾连接路工程下已平整的土地) ,供住宅发展及兴建重要连接路,以及提供游憩用地,包括海滨长廊及市镇边缘地区公园。 |
| 6. | The green island reclamation will produce about 186 hectares of land ( including some 10 hectares already formed under the belcher bay link project ) on the north of kennedy town for residential development and strategic road links as well as provision of open spaces including waterfront promenades and an urban fringe park 青洲填海工程将在坚尼地城北面填造约186公顷土地(包括约十公顷在卑路乍湾连接路工程下已平整的土地) ,供住宅发展及兴建重要连接路,以及提供游憩用地,包括海滨长廊及市镇边缘地区公园。 |